1.  [Wage rates](https://wagepilot.ai/prevailing-wage)
2.  [Illinois](https://wagepilot.ai/prevailing-wage/illinois)
3.  IL20260009

Illinois Davis-Bacon wage determination

# IL20260009: Building, Heavy, Highway, Residential rates for Cook County

The minimum base and fringe rates for laborers and mechanics on federally funded or assisted building, heavy, highway, residential construction covered by this determination in Cook County, Illinois.

Checked against SAM.gov on October 30, 2026.

[Check a payroll against IL20260009](https://wagepilot.ai/check-payroll?source=prevailing-wage&wd=IL20260009&county=Cook)  
[Open on SAM.gov](https://sam.gov/wage-determination/IL20260009/3)

Determination

IL20260009

Modification

3

Construction type

Building, Heavy, Highway, Residential

Published

October 22, 2026

Last modified

October 22, 2026

Counties

Cook

## Rates

83 classifications, in the order the determination lists them. The rate identifier says where a rate comes from: a union agreement (such as ELEC0351-006), a union average (UAVG) or a wage survey (SU…). Letters after a fringe refer to the determination’s footnotes. The notes at the top of the determination on SAM.gov, such as federal contractor minimum wage notices and paid leave requirements, apply as well.

Classification

Rate identifier

Base

Fringe

HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)

ASBE0017-001

$41.27

$32.76

FIRE STOP TECHNICIAN

ASBE0017-001

$44.02

$32.76

ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)

ASBE0017-001

$55.02

$35.75

BOILERMAKER

BOIL0001-001

$53.10

$38.54

BRICKLAYER

BRIL0021-001

$44.88

$26.62

MARBLE MASON

BRIL0021-004

$44.63

$26.83

TILE SETTER

BRIL0021-006

$45.49

$25.72

TILE FINISHER

BRIL0021-006

$38.56

$22.10

TERRAZZO WORKER/SETTER

BRIL0021-006

$44.38

$25.84

MARBLE FINISHER

BRIL0021-009

$33.95

$26.03

POINTER, CLEANER AND CAULKER

BRIL0021-012

$45.42

$24.06

CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway)

CARP0555-001

$52.01

$38.85

CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Building)

CARP0555-001

$52.01

$38.85

CARPENTER (RESIDENTIAL CONSTRUCTION)

CARP0555-002

$45.61

$35.31

LINE CONSTRUCTION: GROUNDMAN

ELEC0009-003

$48.44

$29.09

LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR)

ELEC0009-003

$62.10

$37.29

ELECTRICIAN

ELEC0134-001

$57.75

$42.89

ELECTRICIAN:ELECTRICAL TECHNICIAN: THE WORK SHALL CONSIST OF THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND VISION PRODUCTION AND REPRODUCTION, TELEPHONE AND TELEPHONE INTERCONNECT, FACSIMILE, DATA APPATATUS, COAXIAL, FIBRE OPTIC AND WIRELESS EQUIPMENT, APPLIANCES AND SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF ANY NATURE, BUSINESS, DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND RESIDENTIAL PURPOSES, INCLUDING BUT NOT LIMITED TO COMMUNICATION AND TELEPHONE, ELECTRONIC AND SOUND EQUIPMENT, FIBRE OPTIC AND DATA COMMUNICATION SYSTEMS, AND THE PERFORMANCE OF ANY TASK DIRECTLY RELATED TO SUCH INSTALLATION OR SERVICE WHETHER AT NEW OR EXISTING SITES, SUCH TASKS TO INCLUDE THE PLACING OF WIRE AND CABLE AND ELECTRICAL POWER CONDUIT OR OTHER RACEWAY WORK WITHIN THE EQUIPMENT ROOM AND PULLING WIRE AND/OR CABLE THROUGH CONDUIT AND THE INSTALLATION OF ANY INCIDENTIAL CONDUIT.

ELEC0134-003

$51.14

$30.55

ELEVATOR MECHANIC FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE

ELEV0002-001

$70.68

$38.44

OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS

ENGI0150-006

$63.20

$53.05

OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD)

ENGI0150-006

$64.95

$53.05

OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)\*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH ""A"" FRAME. \*-REQUIRES OILER

ENGI0150-006

$67.50

$53.05

OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT\*; ASPHALT SPREADER; AUTOGRADE\*; BACKHOES WITH CAISSON ATTACHMENT\*:BATCH PLANT\*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS\*; CENTRAL REDI-MIX PLANT\*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)\*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.\*; CONCRETE PAVER 27E CU FT AND UNDER\*; CONCRETE PLACER\*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES\*; CRANES, HAMMERHEAD\*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING\*; FORMLESS CURB AND GUTTER MACHINE\*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES\*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL\*; PILE DRIVERS AMD SKID RIG\*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL\*; ROTO MILL GRINDER (36"" AND OVER)\*; ROTO MILL GRINDER (LESS THAN 36"")\*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER\*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES\*. \*-REQUIRES OILER

ENGI0150-006

$68.80

$53.05

OPERATOR: POWER EQUIPMENT, GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING

ENGI0150-025

$57.80

$51.00

OPERATOR: POWER EQUIPMENT, GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES;

ENGI0150-025

$59.00

$51.00

OPERATOR: POWER EQUIPMENT, GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN

ENGI0150-025

$60.40

$51.00

OPERATOR: POWER EQUIPMENT, GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT\*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO OPERATORS); LASER SCREED\*; LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS \*REQUIRES OILER

ENGI0150-025

$62.45

$51.00

OPERATOR: POWER EQUIPMENT, GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT\*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE\*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER\*, BACKHOES WITH CAISSON ATTACHMENT\*, BALLAST REGULATOR, BELT LOADER\*; CAISSON RIGS\*CAR DUMPER, CENTRAL REDI-MIX PLANT\*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT\*; CONCRETE PLACER\*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS\*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE\*; CRETER CRANE; CRUSHER, STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING\*; DOWELL MACHINE WITH AIR COMPRESSOR ($1.00 ABOVE CLASS 1); DREDGES\*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE\*; GRADALL AND MACHINES OF A LIKE NATURE\*; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED\*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES\*; BACKHOES WITH SHEAR ATTACHMENTS\*; MUCKING MACHINE; PILE DRIVERS AND SKID RIG\*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)\*; ROCK DRILL- CRAWLER OR SKID RIG\*; ROCK DRILL TRUCK MOUNTED\*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, (36"" AND OVER)\*; SLIP-FORM PAVER\*; SOIL TEST DRILL RIG, TRUCK MOUNTED\*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER\*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER MACHINE\*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM\*; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.\*; WHEEL EXCAVATOR\* & WIDENER (APSCO); RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT\* \*REQUIRES OILER

ENGI0150-025

$63.00

$51.00

IRONWORKER: STRUCTURAL AND REINFORCING

IRON0001-026

$62.46

$46.58

IRONWORKER: SHEETER

IRON0001-026

$62.71

$46.58

IRONWORKER: ORNAMENTAL

IRON0063-001

$59.26

$44.81

IRONWORKER (FENCE ERECTOR)

IRON0063-002

$52.25

$34.31

IRONWORKER: MASTER RIGGERS

IRON0136-001

$56.75

$47.38

IRONWORKER (MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS)

IRON0136-001

$54.25

$47.38

LABORER, BUILDING & RESIDENTIAL: GROUP 12 DOSIMETER USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS

LABO0002-006

$52.40

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY

LABO0002-006

$51.68

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 10 BOILER SETTER PLASTIC LABORERS

LABO0002-006

$51.85

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM MEN

LABO0002-006

$51.75

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 8 FIREBRICK & BOILER LABORERS

LABO0002-006

$51.73

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 7 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND OTHER POWER TOOLS

LABO0002-006

$51.63

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 6 STONE DERRICKMEN & HANDLERS

LABO0002-006

$51.60

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 5 CEMENT GUN NOZZLE LABORERS (GUNITE); WINDLASS AND CAPSTAN PERSON

LABO0002-006

$51.55

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 4 CHIMNEY OVER 40 FT.; SCAFFOLD LABORERS

LABO0002-006

$51.50

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 3 CEMENT GUN

LABO0002-006

$51.48

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS

LABO0002-006

$51.40

$36.94

LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS

LABO0002-006

$51.40

$36.94

LABORER, HEAVY & HIGHWAY: GROUP 5 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE

LABO0002-007

$51.40

$36.94

LABORER, HEAVY & HIGHWAY: GROUP 4 RAKERS, LUTEMEN; MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN; JACKHAMMERMEN (ASPHALT); PAINTMEN; MITRE BOX SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN (CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER TOOLS

LABO0002-007

$51.68

$36.94

LABORER, HEAVY & HIGHWAY: GROUP 3 CEMENT GUN NOZZLE (LABORERS), GUNITE

LABO0002-007

$51.55

$36.94

LABORER, HEAVY & HIGHWAY: GROUP 2 ASPHALT TAMPERS & SMOOTHERS; CEMENT GUN LABORERS

LABO0002-007

$51.48

$36.94

LABORER, HEAVY & HIGHWAY: GROUP 1 COMMON LABORER; TENDERS; MATERIAL EXPEDITOR (ASPHALT PLANT); STREET PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER, STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED

LABO0002-007

$51.40

$36.94

LABORER, TUNNEL AND SEWER: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER)

LABO0002-008

$51.40

$36.94

LABORER, TUNNEL AND SEWER: GROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM OPERATOR; LINER PLATE AND RING SETTERS; SHIELD DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS; PIPE JACKING MACHINE OPERATOR; SKINNERS; MAINTENANCE TECHNICIAN

LABO0002-008

$51.75

$36.94

LABORER, TUNNEL AND SEWER: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS

LABO0002-008

$51.63

$36.94

LABORER, TUNNEL AND SEWER: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER

LABO0002-008

$51.53

$36.94

LABORER, TUNNEL AND SEWER: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS

LABO0002-008

$51.40

$36.94

LABORER, COMPRESSED AIR: 34 - AND OVER

LABO0002-008

$55.40

$36.94

LABORER, COMPRESSED AIR: 27 - 33 POUNDS

LABO0002-008

$54.40

$36.94

LABORER, COMPRESSED AIR: 21 - 26 POUNDS

LABO0002-008

$53.40

$36.94

LABORER, COMPRESSED AIR: 16 - 20 POUNDS

LABO0002-008

$52.90

$36.94

LABORER, COMPRESSED AIR: 0 - 15 POUNDS

LABO0002-008

$52.40

$36.94

LABORER, DEMOLITION/WRECKING: GROUP 3 ASBESTOS WORK WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK

LABO0225-001

$51.40

$36.94

LABORER, DEMOLITION/WRECKING: GROUP 2 INTERIOR WRECKING AND STRIP OUT WORK

LABO0225-001

$51.40

$36.94

LABORER, DEMOLITION/WRECKING: GROUP 1 COMPLETE DEMOLITION

LABO0225-001

$46.40

$36.94

PAINTER (INCLUDING TAPER)

PAIN0014-001

$53.05

$33.91

GLAZIER

PAIN0027-001

$51.55

$44.09

PLASTERER

PLAS0005-002

$42.25

$26.65

CEMENT MASON/CONCRETE FINISHER

PLAS0502-001

$53.10

$43.80

PLUMBER

PLUM0130-001

$60.50

$39.02

PIPEFITTER

PLUM0597-002

$55.00

$38.62

ROOFER

ROOF0011-001

$50.25

$30.43

SPRINKLER FITTER

SFIL0281-001

$63.25

$36.50

SHEET METAL WORKER

SHEE0073-001

$49.10

$42.91

SHEET METAL WORKER (ALUMINUM GUTTER WORK)

SHEE0073-002

$31.32

$37.02

TRUCK DRIVER: 6 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK

TEAM0731-001

$46.20

$30.27

TRUCK DRIVER: 5 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK

TEAM0731-001

$46.00

$30.27

TRUCK DRIVER: 4 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK

TEAM0731-001

$45.80

$30.27

TRUCK DRIVER: 2 OR 3 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK

TEAM0731-001

$45.55

$30.27

TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT)

TEAM0731-002

$43.40

$22.71

TRUCK DRIVER: 6 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

TEAM0786-001

$54.64

$0.30

TRUCK DRIVER: 5 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

TEAM0786-001

$54.43

$0.30

TRUCK DRIVER: 4 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

TEAM0786-001

$54.21

$0.30

TRUCK DRIVER: 2 & 3 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

TEAM0786-001

$53.95

$0.30

## Other determinations for these counties

- [Cook County  
    4 determinations](https://wagepilot.ai/prevailing-wage/illinois/cook-county)

## Change history

Changes WagePilot has seen on SAM.gov since it began mirroring this determination.

- October 29, 2026  
    First seen, Modification 3.

Check your payroll against this determination

## Upload one week of payroll. The IL20260009 rates are already loaded.

[Check a payroll free](https://wagepilot.ai/check-payroll?source=prevailing-wage&wd=IL20260009&county=Cook)

**About these rates**  
WagePilot mirrors Davis-Bacon general wage determinations from SAM.gov, the official source, and re-checks each one daily. The wage determination incorporated in your contract governs, including its modification number, footnotes and any conformed classifications. WagePilot reviews payroll; it does not file, certify or give legal advice.

---

Source: https://wagepilot.ai/prevailing-wage/illinois/il20260009 (last updated 2026-10-22)
