New York Davis-Bacon wage determination

# NY20260045: Building, Heavy, Highway rates for Tioga County

The minimum base and fringe rates for laborers and mechanics on federally funded or assisted building, heavy, highway construction covered by this determination in Tioga County, New York.

Checked against SAM.gov on October 30, 2026.

[Check a payroll against NY20260045](https://wagepilot.ai/check-payroll?source=prevailing-wage&wd=NY20260045&county=Tioga)  
[Open on SAM.gov](https://sam.gov/wage-determination/NY20260045/2)

Determination

NY20260045

Modification

2

Construction type

Building, Heavy, Highway

Published

May 18, 2026

Last modified

May 18, 2026

Counties

Tioga

## Rates

88 classifications, in the order the determination lists them. The rate identifier says where a rate comes from: a union agreement (such as ELEC0351-006), a union average (UAVG) or a wage survey (SU…). Letters after a fringe refer to the determination’s footnotes. The notes at the top of the determination on SAM.gov, such as federal contractor minimum wage notices and paid leave requirements, apply as well.

Classification

Rate identifier

Base

Fringe

HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM)

ASBE0030-001

$38.50

$25.04

ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)

ASBE0030-001

$43.25

$27.29

HAZARDOUS MATERIAL HANDLER (SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM)

ASBE0030-001

$38.50

$25.04

ASBESTOS/INSULATOR WORKER (INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT.)

ASBE0030-001

$43.25

$27.29

BOILERMAKER

BOIL0197-001

$43.34

$27.66

MARBLE MASONS, TILE LAYER, TERRAZZO WORKER: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA))

BRNY0003-014

$34.34

$28.46

CEMENT MASONS: HEAVY &amp; HIGHWAY CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA))

BRNY0003-014

$38.63

$25.05

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION (CORNING CHAPTER TIOGA COUNTY (TOWNSHIPS OF BARTON, SPENCER AND PART OF NICHOLS AND TIOGA))

BRNY0003-014

$34.34

$28.46

CEMENT MASON/CONCRETE FINISHER: HEAVY &amp; HIGHWAY CONSTRUCTION (BINGHAMTON CHAPTER TIOGA COUNTY (TOWNSHIPS OF BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD, PARTS OF CANDOR, NICHOLS AND TIOGA))

BRNY0003-015

$38.63

$25.05

CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY CONSTRUCTION)

BRNY0008-003

$38.63

$25.05

BRICKLAYER (BUILDING CONSTRUCTION MARBLE, TILE AND TERRAZZO FINISHERS)

BRNY0008-003

$34.44

$20.38

BRICKLAYER (BUILDING CONSTRUCTION BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, TILE SETTERS, TERRAZZO WORKERS, MARBLE MASONS, POINTERS, CAULKERS, TUCKERS)

BRNY0008-003

$34.34

$28.46

MILLWRIGHT BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY

CARP0277-011

$31.69

$21.92

CARPENTERS: (HEAVY & HIGHWAY CONSTRUCTION) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY

CARP0277-011

$39.52

$27.16

CARPENTER BUILDING CONSTRUCTION FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED (1) DAY BEFORE AND (1) DAY AFTER THE HOLIDAY

CARP0277-011

$31.69

$21.92

ELECTRICIAN (BARTON AND NICHOLS TOWNSHIPS)

ELEC0139-008

$43.40

$31.72

ELECTRICIAN (CANDOR AND SPENCER TOWNSHIPS)

ELEC0241-001

$44.50

$31.89

ELECTRICIAN (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS)

ELEC0325-004

$42.68

$33.06

CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS)

ELEC0325-004

$50.43

$33.29

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

ELEC1249-003

$42.29

$30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

ELEC1249-003

$52.86

$35.60

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

ELEC1249-003

$47.57

$31.03

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

ELEC1249-003

$42.29

$30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

ELEC1249-003

$31.72

$29.87

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &amp;amp; TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

ELEC1249-004

$61.56

$36.21

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &amp;amp; TECHNICIAN (Substation:)

ELEC1249-004

$61.56

$36.21

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

ELEC1249-004

$49.25

$31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

ELEC1249-004

$55.40

$31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)

ELEC1249-004

$55.40

$31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

ELEC1249-004

$55.40

$31.78

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

ELEC1249-004

$35.34

$30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)

ELEC1249-004

$35.34

$30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

ELEC1249-004

$35.34

$30.12

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

ELEC1249-004

$64.59

$42.92

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)

ELEC1249-004

$63.14

$33.82

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

ELEC1249-004

$49.25

$31.15

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

ELEC1249-004

$49.25

$31.15

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

ELEC1249-004

$61.56

$36.21

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

ELEC1249-008

$38.73

$6.93

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

ELEC1249-008

$20.53

$6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

ELEC1249-008

$40.81

$6.99

ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

ELEV0062-002

$58.44

$38.44

POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BUILDING HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY.

ENGI0158-007

$51.71

$32.80

POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, SELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DISEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELTCRETE POWER PACK (BELCRETE SYSTEM SEEDING AND MULCHING MACHINES PUMPS. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

ENGI0158-007

$46.54

$32.80

POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

ENGI0158-007

$48.85

$32.80

POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER DRILL-HYDRAULIC ROCK DRILL. HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

ENGI0158-007

$49.31

$32.80

POWER EQUIPMENT OPERATORS: GROUP 3

ENGI0158-030

$53.82

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$58.91

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$60.30

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$61.80

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$63.30

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$56.39

$33.55

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

ENGI0158-030

$57.30

$33.55

IRONWORKER (STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER, SHEETER BUCKER-UP)

IRON0060-006

$37.16

$30.68

LABORERS: HEAVY AND HIGHWAY GROUP 5: HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$38.76

$25.60

LABORERS: HEAVY AND HIGHWAY GROUP 4: BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY.

LABO0785-011

$36.16

$25.60

LABORERS: HEAVY AND HIGHWAY GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$35.96

$25.60

LABORERS: HEAVY AND HIGHWAY GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OPERATOR (1 1/2' AND SINGLE DEAPHRAM), NOZZLER (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, OTHER GAS ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY.

LABO0785-011

$35.76

$25.60

LABORERS: HEAVY AND HIGHWAY GROUP 1: COMMON LABORERS, FLAGGERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$35.56

$25.60

LABORERS: GROUP 3 (BUILDING) ASBESTOS ABATEMENT AND HAZARDOUS WASTE REMOVAL TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$28.50

$22.46

LABORERS: GROUP 2 (BUILDING) MASONARY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT, BLASTERS TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$28.50

$22.46

LABORERS: GROUP 1 (BUILDING) BASIC LABORER TOWNSHIPS OF RICHFORD, BERKSHIRE, NEWARK VALLEY, OWEGO, TIOGA, BARTON AND NICHOLS FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEAR'S DAY

LABO0785-011

$26.50

$22.46

LABORER: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

LABO0785-019

$38.76

$25.60

LABORER: HEAVY & HIGHWAY: GROUP 4: BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

LABO0785-019

$35.76

$25.60

LABORER: HEAVY & HIGHWAY: GROUP 3: ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

LABO0785-019

$35.96

$25.60

LABORER: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOLS; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPERS; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATOR (1-1/2"" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

LABO0785-019

$36.16

$25.60

LABORER: HEAVY & HIGHWAY: GROUP 1: LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS REMAINDER OF COUNTY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

LABO0785-019

$35.56

$25.60

PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR)

PAIN0004-032

$29.10

$23.83

PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK)

PAIN0004-032

$29.10

$23.83

PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT))

PAIN0004-032

$29.50

$23.83

PAINTERS: (SPRAY EPOXY)

PAIN0004-032

$30.00

$23.83

PAINTERS: (PAINTERS AND TAPERS)

PAIN0004-032

$29.93

$23.83

PAINTERS: (EPOXY-BRUSH & ROLLER)

PAIN0004-032

$29.60

$23.83

GLAZIER

PAIN0677-003

$30.00

$31.95

PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF NEWARK VALLEY AND OWEGO)

PLUM0112-007

$44.91

$33.31

PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (THE TOWNS OF BARTON, BERKSHIRE, CANDOR, NICHOLS, RICHFORD, SPENCER AND TIOGA)

PLUM0267-005

$35.51

$24.57

ROOFER

ROOF0203-001

$30.50

$19.84

SPRINKLER FITTER

SFNY0669-001

$47.85

$28.94

SHEET METAL WORKER

SHEE0112-004

$35.94

$20.89

TRUCK DRIVER GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT DISTRIBUTORS; FUEL TRUCK FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

TEAM0529-001

$26.52

$15.91

TRUCK DRIVER GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TRUCKS; DUMPSTER (TANDEM) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

TEAM0529-001

$26.03

$15.91

TRUCK DRIVER GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

TEAM0529-001

$25.96

$15.91

## Other determinations for these counties

- [Tioga County  
    3 determinations](https://wagepilot.ai/prevailing-wage/new-york/tioga-county)

## Change history

Changes WagePilot has seen on SAM.gov since it began mirroring this determination.

- October 29, 2026  
    First seen, Modification 2.

Check your payroll against this determination

## Upload one week of payroll. The NY20260045 rates are already loaded.

[Check a payroll free](https://wagepilot.ai/check-payroll?source=prevailing-wage&wd=NY20260045&county=Tioga)

**About these rates**  
WagePilot mirrors Davis-Bacon general wage determinations from SAM.gov, the official source, and re-checks each one daily. The wage determination incorporated in your contract governs, including its modification number, footnotes and any conformed classifications. WagePilot reviews payroll; it does not file, certify or give legal advice.

---

Source: https://wagepilot.ai/prevailing-wage/new-york/ny20260045 (last updated 2026-05-18)