CA20260009: Residential rates for Madera, Kern, Fresno and 4 more counties
The minimum base and fringe rates for laborers and mechanics on federally funded or assisted residential construction covered by this determination in Madera, Kern, Fresno, Merced, San Joaquin, Stanislaus, Tulare Counties, California.
Checked against SAM.gov on .
- Determination
- CA20260009
- Modification
- 1
- Construction type
- Residential
- Published
- May 18, 2026
- Last modified
- May 18, 2026
- Counties
- Madera, Kern, Fresno, Merced, San Joaquin, Stanislaus, Tulare
Rates
78 classifications, in the order the determination lists them. The rate identifier says where a rate comes from: a union agreement (such as ELEC0351-006), a union average (UAVG) or a wage survey (SU…). Letters after a fringe refer to the determination’s footnotes. The notes at the top of the determination on SAM.gov, such as federal contractor minimum wage notices and paid leave requirements, apply as well.
| Classification | Rate identifier | Base | Fringe |
|---|---|---|---|
| ELECTRICIANS: ONE AND TWO-STORIES FRESNO, MADERA AND TULARE COUNTIES | ELEC0100-004 | $19.00 | $7.72 |
| ELECTRICIAN: CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB KERN COUNTY | ELEC0428-002 | $65.40 | $22.15 |
| ELECTRICIAN SAN JOAQUIN COUNTY | ELEC0595-005 | $49.45 | $31.96 |
| ELECTRICIAN MERCED AND STANISLAUS COUNTIES | ELEC0684-003 | $48.50 | $30.09 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | ENGI0003-007 | $63.06 | $34.69 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 | ENGI0003-007 | $64.70 | $34.69 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 | ENGI0003-007 | $66.39 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A | ENGI0003-007 | $54.69 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 | ENGI0003-007 | $56.71 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 | ENGI0003-007 | $57.79 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 | ENGI0003-007 | $58.88 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 | ENGI0003-007 | $60.15 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 | ENGI0003-007 | $61.36 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 | ENGI0003-007 | $62.69 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 | ENGI0003-007 | $64.09 | $34.69 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 | ENGI0003-007 | $65.54 | $34.69 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) | ENGI0003-019 | $49.64 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) | ENGI0003-019 | $47.64 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) | ENGI0003-019 | $54.25 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) | ENGI0003-019 | $52.25 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) | ENGI0003-019 | $57.85 | $28.56 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) | ENGI0003-019 | $55.85 | $28.56 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 9 | ENGI0012-009 | $48.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 8 | ENGI0012-009 | $48.48 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 7 | ENGI0012-009 | $48.31 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 6 | ENGI0012-009 | $48.19 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 5 | ENGI0012-009 | $48.08 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 4 | ENGI0012-009 | $47.86 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 3 | ENGI0012-009 | $47.72 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 2 | ENGI0012-009 | $47.43 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 13 | ENGI0012-009 | $52.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 12 | ENGI0012-009 | $51.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 11 | ENGI0012-009 | $50.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 10 | ENGI0012-009 | $49.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 1 | ENGI0012-009 | $46.65 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 25 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.98 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 24 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.81 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 23 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.69 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 22 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.58 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 21 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.48 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 20 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.31 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 19 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.19 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 18 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.08 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 17 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.98 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 16 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.81 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 15 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.69 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 14 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.61 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 13 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.58 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 12 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.48 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 11 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.41 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 10 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.31 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 9 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.29 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 8 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.19 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 7 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $49.18 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 6 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.08 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 5 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $48.96 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 4 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $47.86 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 3 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $46.37 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 2 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $46.08 | $25.25 |
| OPERATOR: POWER EQUIPMENT GROUP 1 (KERN COUNTY SITE WORK ONLY) | ENGI0012-009 | $45.30 | $25.25 |
| PAINTERS: BRUSH MERCED, STANISLAUS & SAN JOAQUIN COUNTIES FOOTNOTES: SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR | PAIN0016-014 | $43.45 | $22.80 |
| PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK KERN COUNTY: | PAIN0036-017 | $34.08 | $18.50 |
| SOFT FLOOR LAYER FRESNO, MADERA AND TULARE COUNTIES | PAIN0294-001 | $38.53 | $23.19 |
| SOFT FLOOR LAYER SAN JOAQUIN AND STANISLAUS COUNTIES | PAIN1237-004 | $48.54 | $26.59 |
| SOFT FLOOR LAYER KERN COUNTY | PAIN1247-004 | $45.15 | $19.43 |
| CEMENT MASON/CONCRETE FINISHER (SITE WORK ONLY) FRESNO, MADERA, MERCED, SAN JOAQUIN, STANISLAUS AND TULARE COUNTIES | PLAS0300-004 | $39.20 | $19.71 |
| CEMENT MASON/CONCRETE FINISHER (SITE WORK ONLY) KERN COUNTY | PLAS0500-004 | $47.70 | $27.07 |
| PLUMBER: SEWER & STORM DRAIN WORK KERN COUNTY | PLUM0345-002 | $48.84 | $23.58 |
| PLUMBER: LANDSCAPE/IRRIGATION FITTER KERN COUNTY | PLUM0345-002 | $44.75 | $26.20 |
| PLUMBER: ALL OTHER WORK KERN COUNTY | PLUM0460-001 | $48.83 | $22.73 |
| ROOFER FRESNO, KERN, MADERA AND TULARE COUNTIES | ROOF0027-003 | $45.76 | $16.86 |
| ROOFER MERCED, SAN JOAQUIN AND STANISLAUS COUNTIES | ROOF0081-008 | $49.65 | $22.19 |
| PLASTERER | SUCA2001-001 | $17.50 | $0.00 |
| LATHER | SUCA2001-001 | $15.00 | $0.00 |
| LABORER, GENERAL | SUCA2001-001 | $7.25 | $0.00 |
| CARPENTER | SUCA2001-001 | $21.24 | $7.20 |
| BRICKLAYER | SUCA2001-001 | $17.00 | $1.12 |
| BRICK TENDER | SUCA2001-001 | $11.00 | $0.96 |
Other determinations for these counties
Change history
Changes WagePilot has seen on SAM.gov since it began mirroring this determination.
- First seen, Modification 1.
Upload one week of payroll. The CA20260009 rates are already loaded.
About these ratesWagePilot mirrors Davis-Bacon general wage determinations from SAM.gov, the official source, and re-checks each one daily. The wage determination incorporated in your contract governs, including its modification number, footnotes and any conformed classifications. WagePilot reviews payroll; it does not file, certify or give legal advice.
