NY20260013: Building rates for Oneida County
The minimum base and fringe rates for laborers and mechanics on federally funded or assisted building construction covered by this determination in Oneida County, New York.
Checked against SAM.gov on .
- Determination
- NY20260013
- Modification
- 2
- Construction type
- Building
- Published
- May 18, 2026
- Last modified
- May 18, 2026
- Counties
- Oneida
Rates
26 classifications, in the order the determination lists them. The rate identifier says where a rate comes from: a union agreement (such as ELEC0351-006), a union average (UAVG) or a wage survey (SU…). Letters after a fringe refer to the determination’s footnotes. The notes at the top of the determination on SAM.gov, such as federal contractor minimum wage notices and paid leave requirements, apply as well.
| Classification | Rate identifier | Base | Fringe |
|---|---|---|---|
| MARBLE, TILE & TERRAZZO WORKERS (UTICA CHAPTER) | BRNY0002-005 | $35.85 | $20.37 |
| MARBLE, TILE & TERRAZZO FINISHER (UTICA CHAPTER) | BRNY0002-005 | $28.52 | $19.59 |
| BRICKLAYER: BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS (UTICA CHAPTER) | BRNY0002-005 | $39.24 | $22.02 |
| CARPENTER: PILEDRIVER | CARP0277-028 | $32.64 | $21.97 |
| CARPENTER (CARPENTERS, MILLWRIGHTS) | CARP0277-028 | $32.64 | $21.97 |
| ELECTRICIAN | ELEC0043-001 | $50.50 | $35.03 |
| CABLE SPLICER | ELEC0043-001 | $55.55 | $35.03 |
| ELEVATOR CONSTRUCTOR FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | ELEV0035-002 | $57.73 | $38.44 |
| POWER EQUIPMENT OPERATOR LOADER, ROLLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.75 | ENGI0158-011 | $48.11 | $31.85 |
| POWER EQUIPMENT OPERATOR CRANE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.75 | ENGI0158-011 | $49.61 | $31.85 |
| POWER EQUIPMENT OPERATOR (BACKHOE, BULLDOZER, FORKLIFT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED FIVE CONSECUTIVE WORKING DAYS BEFORE THE HOLIDAY AND THE WORKING DAY AFTER THE HOLIDAY CRANE PREMIUMS (ADD TO GROUP 1 RATE): BOOM LENGTH INCL. JIB OVER 150 PLUS $1.75 BOOM LENGTH INCL. JIB OVER 200 FT PLUS $2.75 BOOM LENGTH INCL. JIB OVER 300 FT PLUS $3.75 | ENGI0158-011 | $45.99 | $31.85 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (REMANINDER OF COUNTY) | IRON0440-001 | $35.50 | $31.39 |
| LABORERS:, HAZARDOUS WASTE REMOVAL ((HAZARDOUS WASTE REMOVAL INCLUDES, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)) | LABO0035-003 | $24.00 | $20.64 |
| LABORERS: (WAGON DRILL OPERATOR) | LABO0035-003 | $22.90 | $20.64 |
| LABORERS: (PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND), POWER LIFT (WALK BEHIND) WAGON DRILL OPERATOR) | LABO0035-003 | $22.65 | $20.64 |
| LABORERS: (LABORERS) | LABO0035-003 | $22.50 | $20.64 |
| LABORERS: (BLASTERS, FORM SETTERS, MOTOR-BUGGY OPERATOR (RYDER TYPE)) | LABO0035-003 | $23.00 | $20.64 |
| LABORERS: (ASBESTOS REMOVAL) | LABO0035-003 | $24.00 | $20.64 |
| PAINTERS: (SPRAY/SANDBLASTING/STRUCTURAL STEEL) | PAIN0004-021 | $28.82 | $26.88 |
| PAINTERS: (BRUSH & ROLLER, DRYWALL TAPING/FINISHING) | PAIN0004-021 | $28.32 | $26.88 |
| GLAZIER | PAIN0677-002 | $30.00 | $27.59 |
| PLUMBER, INCLUDING STEAMFITTING (NORTHERN ZONE) | PLUM0112-005 | $45.93 | $33.77 |
| ROOFER | ROOF0195-001 | $35.80 | $25.99 |
| SPRINKLER FITTER | SFNY0669-001 | $47.85 | $28.94 |
| SHEET METAL WORKER (PROJECTS OVER $10 MILLION) | SHEE0058-001 | $46.29 | $23.31 |
| SHEET METAL WORKER (PROJECTS 10 MILLION OR LESS) | SHEE0058-001 | $36.29 | $23.31 |
Other determinations for these counties
Change history
Changes WagePilot has seen on SAM.gov since it began mirroring this determination.
- First seen, Modification 2.
Upload one week of payroll. The NY20260013 rates are already loaded.
About these ratesWagePilot mirrors Davis-Bacon general wage determinations from SAM.gov, the official source, and re-checks each one daily. The wage determination incorporated in your contract governs, including its modification number, footnotes and any conformed classifications. WagePilot reviews payroll; it does not file, certify or give legal advice.