NY20260082: Residential rates for Erie County
The minimum base and fringe rates for laborers and mechanics on federally funded or assisted residential construction covered by this determination in Erie County, New York.
Checked against SAM.gov on .
- Determination
- NY20260082
- Modification
- 1
- Construction type
- Residential
- Published
- May 18, 2026
- Last modified
- May 18, 2026
- Counties
- Erie
Rates
24 classifications, in the order the determination lists them. The rate identifier says where a rate comes from: a union agreement (such as ELEC0351-006), a union average (UAVG) or a wage survey (SU…). Letters after a fringe refer to the determination’s footnotes. The notes at the top of the determination on SAM.gov, such as federal contractor minimum wage notices and paid leave requirements, apply as well.
| Classification | Rate identifier | Base | Fringe |
|---|---|---|---|
| CARPENTER (EXCLUDES BATT INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, AND DRYWALL FINISHING/TAPING) | CARP0276-019 | $34.73 | $28.61 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | ELEV0014-006 | $62.39 | $38.44 |
| IRONWORKER, STRUCTURAL | IRON0033-019 | $35.75 | $30.80 |
| IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | IRON0417-004 | $42.63 | $53.70 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | LABO0210-002 | $26.38 | $23.65 |
| PAINTER ((BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING) | PAIN0043-001 | $25.50 | $20.59 |
| PLUMBER | PLUM0022-015 | $27.44 | $23.40 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | SUNY2013-009 | $20.49 | $0.00 |
| ROOFER | SUNY2013-009 | $18.11 | $0.00 |
| PIPEFITTER (HVAC UNIT INSTALLATION ONLY) | SUNY2013-009 | $18.96 | $2.77 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | SUNY2013-009 | $14.14 | $3.76 |
| OPERATOR: LOADER | SUNY2013-009 | $27.88 | $21.40 |
| OPERATOR: BULLDOZER | SUNY2013-009 | $21.20 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | SUNY2013-009 | $51.04 | $5.78 |
| LABORER: MASON TENDER - BRICK | SUNY2013-009 | $18.79 | $0.00 |
| LABORER: LANDSCAPE | SUNY2013-009 | $13.65 | $1.09 |
| LABORER: COMMON OR GENERAL | SUNY2013-009 | $14.18 | $0.00 |
| IRONWORKER, REINFORCING | SUNY2013-009 | $27.06 | $23.02 |
| INSULATOR - BATT | SUNY2013-009 | $10.92 | $0.00 |
| ELECTRICIAN | SUNY2013-009 | $20.64 | $4.70 |
| CEMENT MASON/CONCRETE FINISHER | SUNY2013-009 | $21.07 | $2.15 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | SUNY2013-009 | $15.36 | $4.64 |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | SUNY2013-009 | $18.74 | $4.64 |
| BRICKLAYER | SUNY2013-009 | $29.57 | $0.00 |
Other determinations for these counties
Change history
Changes WagePilot has seen on SAM.gov since it began mirroring this determination.
- First seen, Modification 1.
Upload one week of payroll. The NY20260082 rates are already loaded.
About these ratesWagePilot mirrors Davis-Bacon general wage determinations from SAM.gov, the official source, and re-checks each one daily. The wage determination incorporated in your contract governs, including its modification number, footnotes and any conformed classifications. WagePilot reviews payroll; it does not file, certify or give legal advice.
